All candidates for both the CCNA and BCRAN CCNP exam should read this tutorial!

ISDN is a huge topic on both your Cisco CCNA and BCRAN CCNP exams. While many ISDN topics seem straightforward, it’s the details that make the difference in the exam room and working with ISDN in production networks. Configuring and troubleshooting multilink PPP is just one of the skills you’ll need to pass both of these demanding exams.

With BRI, we've got two B-channels to carry data, and both of them have a 64-kbps capacity. You might think it would be a good idea to have both channels in operation before one reaches capacity, and it is a great idea Problem is, it's not a default behavior of ISDN. The second b-channel will not begin to carry traffic until the first one reaches capacity.

With Multilink PPP (MLP), a bandwidth capacity can be set that will allow the second b-channel to bear data before the first channel reaches capacity. The configuration for MLP is simple, but often misconfigured. We'll use our good friend IOS Help to verify the measurement this command uses.

Enabling MLP is a three-step process:

Enable PPP on the link

Enable MLP with the command ppp multilink

Define the threshold at which the second b-channel should start carrying data with the dialer load-threshold command.

Let's say you wanted the second b-channel to start carrying data when the first channel reaches 75% of capacity. It would make sense that the command to do so would be dialer load-threshold 75... but it's not.

R1(config)#int bri0
R1(config-if)#ppp multilink
R1(config-if)#dialer load-threshold ?
<1-255> Load threshold to place another call

The dialer load-threshold value is based on 255, not 100. To have this command bring the line up at a certain percentage, multiply that percentage by 255. Below, I multiplied 255 by .75 (75%) to arrive at 191.

R1(config-if)#dialer load-threshold 191 ?
either Threshold decision based on max of inbound and outbound traffic
inbound Threshold decision based on inbound traffic only
outbound Threshold decision based on outbound traffic only


R1(config-if)#dialer load-threshold 191 either

As illustrated by IOS Help in the above configuration, dialer load-threshold has additional options as well. You can configure the interface to consider only incoming, outgoing, or all traffic when calculating when to bring the next channel up.

Configuring Multilink PPP is just one of the skills you’ll need to earn your CCNA and pass the CCNP BCRAN exam. Don’t underestimate ISDN on Cisco’s certification exams!

To your Cisco success,

Chris Bryant
CCIE #12933
www.thebryantadvantage.com

Comments

Popular posts from this blog